The Barbican at 44: London's Brutalist Giant Enters Its Renewal Era

Senior editor and core member of the editorial team, contributing criticism and features across contemporary art, film and literature.

By Sara Bright

When Queen Elizabeth II officially opened the Barbican Centre on 3 March 1982, the building was already thirteen years ahead of its housing estate. The Barbican Estate, designed by the architectural partnership of Chamberlin, Powell and Bon, had begun welcoming residents to its 2,014 flats between 1969 and 1976. But the cultural heart of the complex – the performing arts centre, its concert hall, theatre, galleries and that improbable tropical conservatory – took longer to materialise, and longer still to find its public. Forty-four years on, the Barbican finds itself at another inflection point: a £451 million renewal programme, a new chief executive, the departure of its most visible arts leader, and a programme that asserts, with some force, that this Grade II listed concrete behemoth remains central to London’s cultural identity.

From bomb site to Grade II listed icon

The site the Barbican occupies was devastated during the Second World War. The Cripplegate ward was virtually levelled; by 1951, only 48 people still lived there. The Corporation of London decided in 1957 to rebuild the area as a residential quarter for City professionals, and Chamberlin, Powell and Bon – already known for the neighbouring Golden Lane Estate – were commissioned to produce a design that would be at once radical and livable. The result was a 35-acre concrete fortress: three 42-storey tower blocks (Cromwell, Lauderdale and Shakespeare, completed between 1973 and 1976), fourteen terrace blocks, elevated walkways known as highwalks that separate pedestrians from vehicles across the entire complex, and a lake at its centre. The buildings were constructed with a deliberately rough, jackhammered concrete finish to evoke the texture of aged stonework.

The Barbican was Grade II listed in September 2001, when arts minister Tessa Blackstone designated the complex a site of special architectural interest for its scale, cohesion and ambition. It was, at the time, a pointed rebuke to proposals then circulating for an “X” listing category that would have earmarked Brutalist structures for demolition. The listing recognised something that the general public was slower to accept: that a building widely voted “London’s ugliest” – as it was in a 2003 Grey London poll – could also be one of its most important.

The centre cost £161 million to build, equivalent to roughly £574 million in 2025 prices, making it the City of London Corporation’s gift to the nation. It was Europe’s largest performing arts centre when it opened, and it remains the largest in the UK. Today it draws more than 1.5 million visitors a year, making it one of the country’s most popular cultural attractions.

A programme of extraordinary range

What makes the Barbican distinctive is not merely its architecture but the breadth of its programming. The Barbican Hall, with 1,943 seats, is home to both the London Symphony Orchestra and the BBC Symphony Orchestra – two of the world’s leading ensembles sharing a single stage. The Barbican Theatre, designed by and for the Royal Shakespeare Company, holds 1,156 and was the RSC’s London base from 1982 until the company departed in 2002, returning in 2013 under artistic director Greg Doran. The Pit, a flexible 200-seat space, hosts experimental and emerging work. Three cinema screens programme independent and world cinema alongside major releases. The Barbican Art Gallery commissions and presents exhibitions of international significance. And The Curve, a free gallery at the heart of the foyers, offers new commissions to emerging and mid-career artists.

The current programme underlines this range. The immersive exhibition In Other Worlds, which opened in 2026, invites visitors to step into speculative futures through installation and world-building. Project a Black Planet: The Art and Culture of Panafrica surveys the impact of Pan-Africanism on artistic production from the 1920s to the present through more than 300 works – paintings, installations, posters, journals and film. Colombian artist Delcy Morelos’s origo, a monumental site-specific installation of soil, clay and fragrant spices, occupies the Sculpture Court, placing raw materiality in direct dialogue with the surrounding concrete. Meanwhile, the Barbican’s cinema programme ranges from Steven Spielberg’s Disclosure Day – his latest sci-fi epic, starring Emily Blunt and Josh O’Connor – to independent features such as Rohan Kanawade’s Cactus Pears and Pauline Loquès’s debut Nino.

This is not programming that plays it safe. It is, rather, a demonstration of what a publicly funded, municipally owned cultural institution can do when its mandate is genuinely broad.

The Barbican Conservatory: London’s hidden rainforest

The conservatory is the Barbican’s most beloved secret. Opened in 1984, it occupies 23,000 square feet atop the theatre’s fly tower – a feat of engineering that places a tropical rainforest on the roof of a performance space. It is the second largest conservatory in London, after the Princess of Wales Conservatory at Kew Gardens, housing more than 2,000 species of plants and trees alongside terrapins and koi carp. Free to enter, it draws visitors who might otherwise never cross the threshold of a Brutalist arts centre. The conservatory embodies the Barbican’s central paradox: a building that appears forbidding from without, yet contains within it a lush, living, gentle world. It has featured in music videos – most notably Harry Styles’s “As It Was” in 2022 – and in television series including Slow Horses and the Star Wars prequel Andor, where its concrete walkways doubled for the galactic city of Coruscant.

Leadership turbulence and a new era

The Barbican has endured a turbulent period of leadership change. Sir John Tusa served as managing director from 1995 to 2007, overseeing a period of significant development. Sir Nicholas Kenyon succeeded him, holding the post for fourteen years until his resignation in June 2021, following the publication of Barbican Stories – a dossier compiled by current and former staff alleging institutional racism at the centre. The organisation then appointed Claire Spencer as its first-ever chief executive in 2022, but Spencer stepped down after just two years. In September 2025, Abigail Pogson was named as the Barbican’s second permanent CEO, arriving from the Glasshouse International Centre for Music in Gateshead.

In February 2026, the Barbican announced the departure of Devyani Saltzman, its director of arts and participation, who had joined in February 2024. Saltzman had recently unveiled a five-year creative vision for the centre, and had been named by Elle as one of the 40 most influential women working in UK arts. Her departure – the role will not be replaced as part of wider structural changes – prompted an open letter from cultural figures calling for transparency about the decision and the institution’s commitment to diversity in leadership. The Barbican’s refusal to confirm details of the exit left a conspicuous gap at the top of the organisation, just as Pogson prepares to oversee the most significant physical transformation in the centre’s history.

Barbican Renewal: £451 million for the next half-century

The Barbican Renewal programme is the first major overhaul since the centre opened. It has received £191 million in funding from the City of London Corporation – representing approximately 80 per cent of the amount needed for the full five-year plan – with a major fundraising campaign to cover the remainder. The first phase, subject to planning permission, will begin construction in 2027 and be completed by 2030, ahead of the Barbican’s 50th anniversary in 2032.

The scope is significant. The Sculpture Court consultation, which closed in February 2026, sought public input on the redesign of one of the centre’s most architecturally charged spaces. Phase 1 will deliver upgrades to the foyers, lakeside terrace, and conservatory, alongside critical repairs to building systems and ageing materials that have deteriorated over four decades. The most disruptive element is a planned 12-month closure of the theatre, music venue and galleries from June 2028 – a measure that underscores both the urgency of the work and the scale of ambition. The total cost is estimated at £451 million.

The project partners – Allies and Morrison, Asif Khan Studios, Buro Happold, Alan Baxter, Charcoalblue, Mima, Harris Bugg Studio and The Planning Lab – represent a formidable concentration of architectural and engineering expertise. At its core, the renewal programme is animated by a tension that defines the Barbican itself: how to modernise a Grade II listed building without betraying the uncompromising vision that earned it protection in the first place. The Barbican’s official position is one of “sensitive conservation and upgrade” – celebrating the original architectural heritage while making the building truly inclusive, sustainable and resilient. Whether that balance can be struck will determine not just the future of a building, but the viability of a model: the idea that a municipally owned, publicly funded cultural institution, built on a bomb site and clad in raw concrete, can remain, for another half-century, one of the great places to encounter art, music, theatre and film in the world.

The Barbican has always divided opinion. It was designed to. What has changed is the terms of the argument. The question is no longer whether this building deserves to exist, but how best to ensure that it continues to thrive. With a new CEO, a transformational renewal programme, and a programme that ranges from Pan-African art to immersive world-building, the Barbican is answering that question – loudly, and in concrete.